- GB -
Dear customer
Read these instructions through completely before assembling your product in order to avoid errors
in assembly or damage.
IMPORTANT
Please use the enclosed packing list to check immediately that your Engine house
has been delivered complete and intact.
Please do not dispose of the packing list before the guarantee period has expired. This list enables
you to check that all the individual parts are present. It should be retained along with the proof of
purchase. Any complaints which may arise can probably be easily rectified with this list. The item
numbers on the packing list do not correspond to the item numbers in the following assembly
instructions.
We recommend that 2 people carry out the assembly.
In order to prevent accidents, we recommend that children are kept out of the direct vicinity during
assembly.
We reserve the right to make further technological developments. This means that there many be
minor deviations in the illustrations.
The pallet on which the structure is transported comprises 2 floor beams which are required for the
assembly of the structure and 2 distance timbers which are only packaging material and can be
disposed of.
Please do not simply throw away the packaging material. Paper, card and corrugated board as well
as plastic packaging materials should be placed in the correct collection containers.
Recommendations
A prerequisite for successful assembly is an absolutely level and square foundation. We
recommend a continuous foundation.
A foundation plan can be obtained from your specialist dealer.
A raft foundation is also possible.
In order to avoid rising damp, we recommend that a barrier layer using the packaging film, roofing
paper or similar be laid between the foundation and the floor beams.
Roofing paper for a barrier layer is not included in the scope of this delivery.
Fit the wall boards together, with the tongue pointing upwards. If necessary, use a rubber mallet,
where the assembly timber will prevent any damage to the tongue. The assembly timber can be
found in the front wall package.
The structure should be anchored to the foundation to protect against wind damage. Concrete
anchors or steel angles obtainable from specialist suppliers are suitable for anchoring the floor
beams to the foundation. The anchors are not included in the scope of this delivery.
The roofing felt provided serves primarily as a temporary protection against the weather. To
ensure lasting protection we recommend you to cover the roof only with sanded bitumen shingles.
This creates the basis for a long life and resistance to the influences of the weather. Otherwise
damage to your weka product is to be expected.
Please drill pilot holes for all screw connections to avoid damaging the wood. The following symbol
in the instructions will indicate when this is necessary:
Wood protection
Before and during assembly, protect untreated wood from direct sunlight or moisture.
The product is made from natural timber, for which regular and adequate wood preservation
measures are obligatory. Please contact a wood preservation expert for information on
professional preservation measures.
Wood preservation is to be carried out by the customer at his own risk. No guarantee can be given
in the event of wood preservation not carried out in accordance with the instructions. Please also
Copyright HRB 3662
Techn. Änderungen vorbehalten!
Alle Maßangaben sind ca. Maße
3