Cable Entrance And Connection Point; Commissioning; Ventilation - Sunfire ICO-E-10M Manuel D'installation Et D'utilisation

Table des Matières

Publicité

INSTALLATION Continued

Cable Entrance and Connection Point

The service line enters though the rear of the unit and is
connected to the terminal block (Located behind the "flip
down" access door) as indicated in the diagram When
stacking ovens (see diagram), double deck models require
individual power supply connections.
Optional Cable
Exit/Entrance
for Double Deck
Ovens
GRN
Top view of the main deck of double deck ovens or one
single deck oven.
Page 10
Cable
Entrance
Power
Supply
Terminal
Block

Commissioning

Input voltage and phasing must match the unit's voltage and
phasing. A wiring diagram is attached to the main back of
each oven. Visually check all electrical connections. Energize
electrical service to the units. The electric oven is only
available in 3 phase, service and unit voltage must agree.
Unit rating plate is located behind the combustion chamber
front panel.

Ventilation

WARNING Inadequate ventilation may result in the high
ambient temperature at the rear of the oven. Excessive
ambient temperature can cause tripping of the blower motor
terminal overload protection device. This condition must be
corrected immediately to avoid damage to the blower motor.
Part # 4520415 (07/12/11)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ico-e-20m

Table des Matières