Slide the galvanize insert (B-LV-0209)
Slide the galvanize insert (B-LV-0209)
7
7
Slide the galvanize insert (B-LV-0209)
into the top rail (A-UR02) as shown in
into the top rail (A-UR02) as shown in
diagram 13.
diagram 13.
into the top rail (A-UR02) as shown in
diagram 13.
Make the hook (C-LV-0210) close to the side of
Make the hook (C-LV-0210) close to the side of
8
8
railing (A-UR02 ), and predrill the holes on the
railing (A-UR02 ), and predrill the holes on the
Make the hook(C-LV-0210) close to the side
hook (C-LV-0210) with (3mm drill, then fix
hook (C-LV-0210) with (3mm drill, then fix the
of railing (A-UR02 ), and predrill the holes
the hook (C-LV-0210) with WJ0020 accessories,
hook (C-LV-0210) with WJ0020 accessories,
on the hook (C-LV-0210) with φ3mm drill,
as shown in diagram 14.
as shown in diagram 14.
then fix the hook (C-LV-0210) with WJ0020
accessories, as shown in diagrm 14.
Pre-drill and install the foot blocks (I-LV-0216)
Pre-drill and install the foot blocks (I-LV-0216)
9
9
Pre-drill and install the foot blocks (I-LV-0216) with
with screw WJ0020 on the bottom rail as shown
with screw WJ0020 on the bottom rail as shown
screw WJ0020 on the bottom rail as shown in
in diagram 15. Foot blocks should be evenly
in diagram 15. Foot blocks should be evenly
diagram 15. Foot blocks should be evenly spaced
spaced out depending on the length of the
spaced out depending on the length of the
out depending on the length of the fnal rail and
final rail and cannot be installed underneath a
final rail and cannot be installed underneath a
cannot be installed underneath a predrilled
predrilled baluster hole.
predrilled baluster hole.
baluster hole.
Note: Top rail is A in diagram 16. The holes
Note: Top rail is A in diagram 16. The holes
Note: Top rail is A in diagram 16. The
should be facing downwards. Bottom rail is B in
should be facing downwards. Bottom rail is B in
holes should be facing downwards.
diagram 16. The holes should be facing upwards.
diagram 16. The holes should be facing upwards.
Bottom rail is B in diagram 16. The
holes should be facing upwards.
10
WJ0020
WJ0020
DIAGRAM 13
DIAGRAM 13
Screw WJ0020
Screw WJ0020
DIAGRAM 14
DIAGRAM 14
Screw WJ0020
Screw WJ0020
DIAGRAM 15
DIAGRAM 15
DIAGRAM 16
DIAGRAM 16
Attach the bottom rail (A-UR02) onto the
Attach the bottom rail (A-UR02) onto the
A
a t t
h c
h t
b e
t t o
m o
a r
( l i
- A
10
10
bottom post brackets (D-R0211) as shown
bottom post brackets (D-R0211) as shown
post brackets (D-R0211 ) as shown in diagram 17.
in diagram 17.
in diagram 17.
DIAGRAM 17
DIAGRAM 17
Install the baluster plugs (E-LV-0218-B) and aluminum
Install the baluster plugs (E-LV-0218-B)
Install the baluster plugs (E-LV-0218-B)
11
11
and aluminum balusters (M-LV-0218-A-36)
and aluminum balusters (M-LV-0218-A-36)
balusters (M-LV-0218-A-36) as shown in diagram 18.
as shown in diagram 18.
as shown in diagram 18.
DIAGRAM 18
DIAGRAM 18
36" Hybrid Composite Railing Installation Guide |
R U
2 0
o )
o t n
h t
b e
t t o
m o
10