Installation declaration
(in terms of the EC machinery directive 2006/42; Appendix II B)
Leister Technologies AG, Galileo-Strasse 10, CH-6056 Kaegiswil/Switzerland hereby declares the partly
completed machinery
Designation:
Type:
Option:
– as far as it is possible from the scope of supply – fulfills the applicable essential requirements of the EC ma-
chinery directive (2006/42).
The partly completed machinery furthermore complies with the provisions of the following EC directive(s):
EC directive(s):
Harmonised standards:
In addition, we declare the relevant technical documentation for this partly completed machinery is compiled
in accordance with Annex VII (part B) and will be electronically transmitted to national authorities in response
to a reasoned request. Authorised documentation representative: Volker Pohl, Manager Product Conformity
The partly completed machine must not be put into service until the final machinery into which it is to be
incorporated has been declared in conformity with the provisions of the EC machinery directive (2006/42),
where appropriate.
Kaegiswil, 21.10.2015
Disposal
Power tools, accessories and packaging should be recycled. For EU countries only: do not dispose
of power tools in your household rubbish! According to the European Directive 2012/19/EU on
waste electrical and electric equipment and its implementation in national law, power tools which
can no longer be used must be collected separately and recycled.
Hot air blower
HOTWIND
PREMIUM or SYSTEM
Electromagnetic Compatibility
2004/108 (valid until 19.04.2016), 2014/30 (valid from 20.04.2016)
Low Voltage Directive
2006/95 (valid until 19.04.2016), 2014/35 (valid from 20.04.2016)
RoHS Directive 2011/65
EN 12100, EN 55014-1, EN 55014-2, EN 61000-3-2, EN 61000-3-3,
EN 61000-3-11 (Z
), EN 62233, EN 60335-2-45, EN 50581
max
Bruno von Wyl, CTO
Andreas Kathriner, GM
17