1. Loosen the threaded ring
cover
by turning it counterclockwise.
4
2. Lift the prefilter cover
ring off the pump housing.
3. Insert the large O-ring seal
groove on the pump housing.
4. Insert the prefilter
32
The prefilter is already inserted into the pump
at the factory.
5. Place the prefilter cover
housing.
6. Guide the threaded ring over the prefilter
cover.
7. Turn the threaded ring clockwise until it is
hand-tight.
8. Insert the small O-ring seal
9. Screw the hose adapter
10. Place the medium O-ring seal
11. Screw a hose adapter
The pump is ready for operation. You can now connect it to the lines.
Mounting the pump on the base plate
1. Insert the threaded screws of the screw set
for fastening the pump
two hexagonal holes in the base plate
2. Place the pump
on the base plate
3
that the threads protrude through the
fastening opening in the pump base.
3. Push the washer and then the serrated lock
washer over the screw thread.
4. Put on one winged screw each and tighten it.
The pump is mounted on the base plate.
5. Connect the base plate
.
2
The base plate is connected to the filter vessel.
Preparing the filter vessel
1. Undo the locking ring
counter-clockwise. Use the Allen wrench
this purpose.
2. Put aside the locking ring and its screws.
3. Mount the drainage screws set
drainage opening
24
34
on the prefilter
5
with the threaded
4
into the
20
into the pump.
on the pump
4
into the prefilter cover.
18
clockwise into the prefilter cover until it is hand-tight.
21
into the recess of the pump outlet
19
clockwise into the pump outlet until hand-tight.
21
from below into the
13
.
12
so
12
to the filter vessel
12
by turning the screw
7
for
22
on the
11
.
1
5
4
18
20
32
.
28
2
3
21
19
28