en - Information
1. Parts:
A Gateway
B Screws and plugs 6 mm x 30 mm
C Power adapter
2. Steps:
1. Open the gateway:
1.1. Remove the screw.
1.2. Remove the cover from the gateway.
2. Position and mount the gateway:
2.1. Determine the position of the gateway.
2.2. Drill the 3 marked holes.
2.3. Fit the plugs (part B).
2.4. Secure with screws (part B).
3. Remove the cable strain relief clamps.
4. Switch the boiler off.
5. Available connectors of the gateway.
6. Position and mount the power adapter (part D):
6.1. Determine the position power adapter and place the double-sided adhesive circle.
6.2. Remove the peel-off sheet of the double-sided adhesive circle.
6.3. Place the power adapter.
7640332 - v.08 - 04022020
D Power adapter
E Documentation
13