2. INSTALLATION
Important note: Always connect the batteries first.
Connect the individual components as shown.
-
Solar panel(s)
-
Battery and loads in order indicated 1-6.
Install the regulator near the battery. The installation environment should be
indoor, dry and nonflammable. The cables should be as short as possible and
have a suitable cable diameter size to minimize loss, e.g. use 2.5 mm² at 10A;
use 5 mm² at 20A
1.
Mount the controller on a vertical surface. Allow space above and below
the controller for air flow.
2.
Connect the battery to the controller. If the connection is correct, the
battery indicator will be on.
6