Télécharger Imprimer la page

Bosch LI2UAA Notice De Montage page 15

Publicité

Installation - Fig. 4
• Put the template onto the wall (1) and drill
two Ø12mm holes (2).
• Fit two hooks (3) on the drilled holes.
• Remove the metal filters (4).
• Hang the hood on the hooks and adjust the
position of the hood using the two screws on
the bottom of the hooks (5).
• Mark two points (6). Remove the hood and
drill two Ø8mm holes on the marked points.
Fit two Ø8mm wall dowels (7), Hang again
the hood and fix the hood definitively with
two screws 5X45 (8).
• Fix the chimney support (10) with two screws
5 x 45 mm (9) and two wall dowels (11) on
the wall close to the ceiling.
• For exhausting version: Fit the connection
ring (S) on the top of the hood with two
screws Ø 3,5 x 6,5 mm (12S) then fit an
axhausting pipe long enough to reach the
outside (13S).
For recycling version: Fix definitively the
deflector (13K) on the top of the hood with
two screws Ø 3,5 x 6,5 mm (12K).
• Prepare the electric connection (14) (see
relative chapter).
• Fit the chimney (15) and fix it on the chimney
support with two screws 3,0 x 9 mm (16).
The lower part of the chimney must be
slided down and inserted on the housing on
the upper part of the hood (17).
• Fit the two grids (18) on both sides of the
chimney.
GB
15

Publicité

loading