Commissioning; Connecting Power - Siemens SITRANS FUS1010 Guide Rapide

Masquer les pouces Voir aussi pour SITRANS FUS1010:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Commissioning

3.1

Connecting Power

Turn off main power before installing AC connections to the flowmeter. Contact with exposed
wiring may lead to fire, electric shock, or serious personal injury.
1. Using a 1/16" Hex key, loosen the flowmeter Rear Housing Cover locking setscrew.
2. Unscrew the Rear Housing Cover and remove.
3. Locate power supply connector J8. Use the tables below and the part number of your unit
Power Supply Option Code
S
ZN
ZP
Note
Power Supply Module P/N label is located inside the front housing cover.
4. Pull the desired length of input power wires through flowmeter case conduit cable hole and
5. Wire input power connector P8 for AC or DC power depending on power supply provided
FUS1010 IP65 NEMA 4X Quick Start
Operating Instructions, 12/2008, CQO:QSG002 Revision B
DANGER
to determine the correct input power source. (See ID label on right side of housing.)
Power Supply P/N
1010X-6SS2
1010X-6ZNS2
1010X-6ZPS2
into flow meter case before wiring connector.
as shown below. Insert wires into wire entry holes and secure by tightening wire clamp
screws (see figure below).
Note
Power Supply connector wires should be stripped AWG 12-18 stranded wire or solid
conductors.
User Supplied Power
90-250 VAC Single Phase
9-36 VDC Negative Ground
9-36 VDC Positive Ground
3
17

Publicité

Table des Matières
loading

Table des Matières