Encasing The Frame In Concrete; Preparing The Frame - Mettler Toledo PFK9 Serie Informations D'installation

Masquer les pouces Voir aussi pour PFK9 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

30233018C Quick Pit for PFK9-series, sizes D/E/ES
Weighing platform
Type
a
PFK98_-D
125
PFK98_-E
150
PFK98_-ES
150
Also observe the following:
Position of the pit drainage channel for wet pits: see dimensional drawings on
Page 10.
There are 4 possible positions for connecting the connecting cable: see dimensional
drawings on Page 10.
Cable duct diameter: min. 50 mm. Do not use a right-angled pipe, but rather 2 x 45°.
5

Encasing the frame in concrete

5.1

Preparing the frame

d
1
d
= d
1
1. Ensure that the frame is rectangular.
This is the case when the two diagonals are identical in length. Tolerance: +/– 2 mm.
The frame may not be encased if the two diagonals differ by a greater amount!
2
2. Use a flat-bladed screwdriver to fold out the wall anchors (1) (8 / 10 units) on the
sides.
3. Break out the prepared cable outlet (2) at the desired side.
4. If desired, mount iron (3) for the reinforcement.
Quick Pit
b
c
d
100
138
113
125
164
139
150
164
164
d
2
2
1
Rough pit
g
e
f
h
19
160
135
20
19
185
160
25
21
185
185
27
Dimensions in cm
English
7

Publicité

Table des Matières
loading

Table des Matières