Selecting the installation location

3.1 Determining the location of the weighing platform

➜ Do not install near doors (1).
➜ Do not install in highly frequented areas (2).
➜ Protect the weighing platform against strong air movements.
➜ Install the weighing platform at a location free of shocks and vibrations.
2
➜ Ensure the load-bearing capacity of the pit floor: min. 1500 kg / 25 cm

3.2 Determining the location of the weighing terminal

➜ Do not install directly behind the weighing platform (1).
➜ Do not install directly next to the weighing platform (2).
➜ Set up the weighing terminal so that it can be read easily and is easily accessible.
Length of the weighing platform – weighing terminal connecting cable:
2
PFK9__: 5 m, PFK9__APW: 10 m
Optional 10 m or 20 m
4

Digging the rough pit

➜ Dig out the rough pit according to the specified dimensions.
e
c
a
2
Quick Pit for PFK9-series, sizes D/E/ES 30233018C