Installation - ProMariner ProSport 1.5 Manuel Du Propriétaire Et Guide D'installation

Mainteneur et chargeur de batterie multi-usage
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

W I R I N G D I A G R A M S
13
Ignition Protected On-Board Installed Applications
Ring Terminal Cable Installation for Mounting the ProSport 1.5 On-Board a Boat
or Under a Hood Requiring Ignition Protected Installation.
ProSport 1.5 Amp
Multi-Use Maintainer
and Charger
_
12 Volt Engine Battery
Note:
Indicates jumper series
Indicates fuse
Top view
of battery
bat 1
+
For Ignition Protected Applications
Ring Terminal Cable Assembly Only.
The ProSport 1.5 Multi-Use Maintainer and Charger can be permanently mounted on-board,
and can be mounted vertically or horizontally. (vertically is recommended for LED viewing)
Only use the ring terminal cable assembly for on-board and ignition protected
applications.
Always mount your charger in a compartment area that can be properly ventilated
during use.
Do NOT make any electrical connections to the battery charger or batteries until the following
steps are completed:
10 Easy to follow installation steps:
1. Select a mounting location that allows for free air ventilation with a minimum of 4 inches of clear
unobstructed space around and in front of the battery charger. Open all battery and engine
compartments and ventilate for at least 15 minutes before starting the installation of the battery charger.
2. Confirm the DC battery cable can reach the battery for proper connections. Confirm the LEDs
are viewable.
3. Using the ProSport 1.5 as a mounting template, use a small awl or screwdriver to mark
the position of each mounting hole or tape the template in the mounting area to drill the
pilot holes.
4. Using a 1/8" drill bit, drill pilot holes in the (2) marked locations as described in step 3.
Apply a silicon sealer in each of the mounting locations to waterproof the screw holes.
5. Position the charger over the mounting holes and secure with a power screwdriver by installing
2 marine grade or #6 x 1" stainless steel screws. (mounting screws not included)
I N S TA L L AT I O N
14
On-Board Installation with
1/8" pilot hole
with silicon sealer
IMPORTANT NOTICE
Confirm the surface you will
be mounting the charger to
is adequate in strength and
thickness to hold the charger
in place with the mounting
screws you have selected.

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

44001

Table des Matières