System Setup; System Test - Briggs & Stratton 71035 Manuel D'installation Et D'utilisation

Gestionnaire de l'alimentation
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

System Setup

You must perform the following before operating the system:
• Set the SW2 and SW3 dipswitches on the power
management system control board to match the KW
rating of the home standby generator, as described in
Setting Dipswitches.
TS COM
CT1 & CT2
connections
connections
SW2
dipswitch
Control
board
transformer
• In main distribution panel, turn selected load circuit
breakers to the ON position.
Setting Dipswitches
Dipswitches are used to adjust control board operation
based on generator capacity and fuel source. SW2 ("ONE")
and SW3 ("TEN") switches are set to correspond to total
system kW rating. Dipswitch SW2 has units of 1,000 watts;
Dipswitch SW3 has units of 10,000 watts.
IMPORTANT: Set only one switch to "On" position on
SW2 and SW3.
TEST
Air Conditioning
SW1
control wiring
SW3
dipswitch
STATUS
LED
LOAD
LED's
NOTICE Use extreme caution when setting dipswitches or
damage to control board will result.
Use a pencil or small piece of plastic to set the dipswitch.
NEVER use a screwdriver or any type of metal object to
set dipswitches.
The "On" position for the dipswitches is the switch number
ON THE CONTROL BOARD, not on the switch. For example,
on a 27,000 watt generator, set SW3 dipswitch "20" to "On"
position. Set SW2 dipswitch "7" to "On" position. 20,000
plus 7000 equals 27,000 watts.
IMPORTANT: After installation of the system is complete,
turn on utility power to the home standby generator and
transfer switch. Wait one minute before turning generator
system switch to AUTO.

System Test

With the generator system switch in AUTO, turn the service
disconnect feeding the transfer switch contactor to the OFF
position. After a few minutes the generator will start and the
transfer switch will transfer to generator power.
Press the test button on the control module (labeled
"SW1 TEST") in the power management system. As the
button is pressed, a relay will energize. Each time the
button is pressed, the previous relay that was energized will
de-energize and the next relay will energize. This sequence
continues until all relays have been tested. If the test
button has not been pressed for a period of 30 seconds,
the test sequence will halt and the system will revert to
automatic control.
To return to utility power, turn the service disconnect feeding
the transfer switch to the ON position.