Detached installation
with two side stands
Install stand feet (e.g. in
concrete).
Make sure the ground / instal-
lation site is plain and level, so
that the awning can sit solidly.
For concrete, use a 14 mm ma-
sonry drill to drill the holes for
the stand feet. The holes should
be 62 mm apart (centre to cen-
tre) and min. 80 mm deep. The
two stands and the double-sid-
ed blind must form a 90° angle.
The distance from the pole foot
must correspond to the width
of the side blind (W ≤ 3 m).
To install the stand feet, insert
the rawl-bolts through their
base in the drill holes and
tighten them securely.
122
|
ENGLISH
3a
62
62
62
62