Maintenance Instructions - Blatchford EchelonVT Série Instructions D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

9 Maintenance Instructions

Be aware of finger trap hazard at all times.
Use appropriate health and safety equipment at all times including extraction
facilities.
Foot Shell Removal
1
Insert shoe horn behind heel spring.
Heel & Toe Spring Replacement
3
Remove heel spring and screws.
4
5
Re-assemble with replacement heel spring.
Use Loctite 243 (926012) and torque to 15Nm.
2
4
6
4
15Nm
14
Rotate shoe horn as shown to remove
shell.
Remove toe spring screw, replace toe. Upon
reassembly, use Loctite 243 (926012) and torque to
35Nm. Ensure toe spring is central to the carrier.
8
35Nm
Cover
appropriate lines
on carrier with
permanent black
marker to leave
springset
number showing.
938315S/4-0520

Publicité

Table des Matières
loading

Table des Matières