Télécharger Imprimer la page

Alliance Laundry Systems FR-A800 Serie Instructions page 6

Publicité

Les langues disponibles

Les langues disponibles

www.groupdynamics-laundry.com
sales@groupdynamics.lv
Adjustment:
1. Remove and reinstall the front cover
a. Removal and reinstallation of the operation panel
Loosen the two screws on the operation panel. (These
screws cannot be removed.)
Press the upper edge of the operation panel while pull-
ing out the operation panel.
To reinstall the operation panel, align its connector on the
back with the PU connector of the inverter and insert the
operation panel. After confirming that the operation panel
is securely seated, tighten the screws. (Tightening torque:
0.40 to 0.45 Nm)
b. Removal of the terminal block cover (FR-
A820-01540(30K) or lower, FR-A840-00770(30K) or
lower)
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT
Figure 4
Figure 5
(a)
1. Loosen
(b)
(c)
(a) Loosen the screws on the terminal block cover (these
screws cannot be removed).
6
Figure 6
Figure 7
Figure 8
Form No. 12-15-425ENR1

Publicité

loading