Table Des Matières - PEERLESS Precision Gear PRG-UNV Instructions D'installation Et De Montage

Support de projecteur
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Note: Read entire instruction sheet before you start installation and assembly.
• Do not begin to install your Peerless product until you have read and understood the instructions and warnings con-
tained in this Installation Sheet. If you have any questions regarding any of the instructions or warnings, call Peerless
customer care at 1-800-729-0307.
• This product should only be installed by someone of good mechanical aptitude, has experience with basic building
construction, and fully understands these instructions.
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard-
ware and components.
• Never exceed the Maximum UL Load Capacity.
• Always use an assistant or mechanical lifting equipment to safely lift and position equipment.
• Tighten screws firmly, but do not overtighten. Overtightening can damage the items, greatly reducing their holding
power. See suggested torque values where applicable within these instructions.
CAUTION
• It is the responsibility of the installer to ensure that the
projector is properly ventilated. Feet of channels are
used to raise the mount off the projector surface.
Tools Needed for Assembly
• stud finder ("edge to edge" stud finder is recommended)
• phillips screwdriver
• drill
• 1/4" bit for concrete surface
• 5/32" bit for wood studs
• open end wrench
• level
Table of Contents
Parts List .................................................................................................................................................................... 3
Installation to Extension Columns / Ceiling Plate ........................................................................................................ 4
Installation to Wood Joist Ceilings .............................................................................................................................. 5
Installation to Concrete Ceilings .................................................................................................................................. 6
Installation to Threaded Rods ...................................................................................................................................... 7
Attaching Adapter Plate to Projector ........................................................................................................................... 8
Projector Alignment ................................................................................................................................................... 10
Accessories ......................................................................................................................................................... 11, 12
Visit the Peerless Web Site at www.peerlessmounts.com
WARNING
2 of 36
For customer care call 1-800-865-2112 or 708-865-8870.
ISSUED: 02-13-07 SHEET #: 055-9485-2 09-15-07

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Precision gear prg-unv-sPrecision gear prg-unv-w

Table des Matières