Assembly Instructions; Expanding The Feet; Installing The Regulator Valve; Attaching The Lid Handle - Pit Boss PB100P Instructions Et Utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.

EXPANDING THE FEET

Parts Required:
1
x
Firebox Assembly (#1)
Installation:
Place the firebox on a clean, level
surface, thermometer on the top.
Tip the unit backwards and extend
the feet until they lock into position.
2.

INSTALLING THE REGULATOR VALVE

Parts Required:
Regulator (#3)
1
x
Installation:
Insert the end of the regulator valve
into the opening on the side of the
firebox. Hand-tighten by rotating
the part clockwise until completely
secured into the opening.
3.

ATTACHING THE LID HANDLE

Parts Required:
Lid Handle (#2)
1
x
Installation:
Remove the pre-installed screws
from the lid handle. From inside
the barrel lid, insert one screw to
protrude to the outside. Hand-
tighten the screw (from the inside)
into the lid handle. Repeat same
installation for other end of lid
handle. Secure using tool.
The unit is now assembled.

ASSEMBLY INSTRUCTIONS

7

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

75284

Table des Matières