Hydraulic System Connection - Corghi Erco X5000 CT LT PT2 FAST Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

To make the connections between the lift and the control unit, proceed as follows:
1. Remove the control unit door by unscrewing the 4 fixing screws.
2. Extract the hydraulic pipes under the main lift runways.
3. Remove the hydraulic plugs from the hydraulic control unit unions.
4. Connect the pipes to the hydraulic control unit ensuring that the numbers on the
pipes match the ones indicated in figure 8. Be careful to the tightening.
5. Connect the fluid recovery pipes R to the unions on the tank, as shown in (figure
8_1).
N.B.: When all the pipes R have been connected, turn on the cock A fig.8_1.
8
60

Hydraulic system connection

2
5
2
6
5
Operator's manual ERCO X5000 CT LT PT2 FAST
6
1
3
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Erco x5000 ct lt pt2Erco x5000 ct lt fastErco x5000 ct lt

Table des Matières