Ceado E5P Manuel D'utilisation page 28

Masquer les pouces Voir aussi pour E5P:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

28
The EC declaration of conformity for this appliance is available in the Products section of our
website www.ceado.com.
INSTALLATION
Comply with the safety recommendations indicated above and hereafter when installing the
appliance.
For the installation of the appliance, qualified personnel must be present who are able to check the
fineness of the grind.
1.
Make sure that the mains voltage is as indicated on the rating label of the appliance and that
the electrical system is grounded and equipped with a switch.
2.
Install the appliance in a DRY, PROTECTED place, far from water sprays and jets, heat
sources, open flames and inflammable substances.
Place the appliance on a flat, horizontal, stable surface where it cannot tip over.
3.
Put the tray in its housing to keep the work area as clean as possible.
Before connecting the plug to the power socket, make sure that the ON-OFF switch
(8 Fig. 1) is in position "0" (OFF).
4.
Plug the power cable into a socket protected by a suitably rated circuit breaker (MCB) or fuses.
Do not use an adaptor plug.
5.
Stretch the power cable out to full length. Do not let it pass over sharp edges or hot surfaces.
Do not let oil spill on it. Do not let the power cable hang loose from the counter on which the
appliance stands.
6.
Make sure that the bean hopper is correctly positioned and that its shutter (7 Fig. 5) is
completely open (to the last click).
GB

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

E6pE7p

Table des Matières