Laying The Screed; Performing The Electrical Installation - OBO Bettermann UDHOME2 GE 2V 15 NO Instructions De Montage

Boîtier de sol avec évidement du revêtement de sol et prise nf double
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Laying the screed

C lose the hinged cover and attach the steel
plate and mounting cover .
Note: We recommend routing the screed with-
out an additional separation layer . A separation
layer can be used to reduce noise transmission,
although this reduces fixed anchoring of the ser-
vice unit in the screed .
L ay the screen flush to the top edge of the
mounting cover and work it up to the service
unit .

Performing the electrical installation

R emove the mounting cover and steel plate
and dispose of them . Open the hinged lid .
I nsert strain reliefs in front of the installation
pipe .
I nsert the connection cable for the sockets
and strip it by approx . 150–200 mm .
F ix the connection cable by pushing the
strain relief together .
26

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

7368 398

Table des Matières