Qualified personnel should carry out connecting unit to the main power. Be sure to check the local
codes in your area.
Before connecting the unit to the electrical supply, verify the identification plate for the proper electrical
information. Voltage tolerance is +/- 5%.
Dryer supplied at 115/1/60 voltage comes with a mains connecting cable already installed and ending with a
North-American standard plug 2 poles + ground. Dryer supplied at 230/1/60, voltages comes with a box for
the connection to the mains.
Be sure to provide the proper fuses or breakers based on the data information located on the nameplate.
The mains socket must be provided with a mains magneto-thermal differential breaker (I∆n=0.03A),
adjusted on the basis of the consumption of the dryer (see the nominal values on the data plate of the
dryer). The cross section of the power supply cables must comply with the consumption of the dryer, while
keeping into account also the ambient temperature, the conditions of the mains installation, the length of the
cables, and the requirements enforced by the local Power Provider.
Connect to a properly grounded outlet. Improper connection of the equipment-grounding
conductor can result in risk of electric shock. Do not use adapters on the main socket- if it does
not fit the outlet, have a proper outlet installed by a qualified electrician.
The condensate is discharge at the system pressure.
Drain line should be secured.
Never point the condensate drain line towards anybody.
The dryer comes already fitted with two electronically level controlled BEKOMAT condensate drains.
Connect and properly fasten the condensate drain to a collecting plant or container.
The drain cannot be connected to pressurized systems.
Don't dispose the condensate in the environment.
The condensate collected in the dryer contains oil particles released in the air by the compressor.
Dispose the condensate in compliance with the local rules.
We suggest to install a water-oil separator where to convey all the condensate drain coming from
compressors, dryers, tanks, filters, etc.
Verify that the operating parameters match with the nominal values stated on the identification plate
of the dryer (voltage, frequency, air pressure, air temperature, ambient temperature, etc.).
This dryer has been thoroughly tested, packaged and inspected prior to shipment. Nevertheless, the unit
could be damaged during transportation, check the integrity of the dryer during first start-up and monitor
operation during the first hours of operation.
Qualified personnel must perform the first start-up.
When installing and operating this equipment, comply with all National Electrical Code and any
applicable federal, state and local codes.
Who is operating the unit is responsible for the proper and safe operation of the dryer.
Never operate equipment with panels removed.

2.7 ELECTRICAL CONNECTIONS

2.8 CONDENSATE DRAIN