BATTERY CHARGING
FOR SAFETY: Always stop machine on a flat
level surface and engage the wheel lock
before servicing the machine.
1. To charge, bring unit to location of charger.
2. Plug the charger cord into the battery charger
receptacle.
3. Yellow light on the charger indicates the unit is
charging.
100−Tb/200−Tb DM20016 (7−2012)
OPERATION EN
4. Charging may take several hours (charging
occurs at 1.25 amps − allow 8−14 hrs to
charge from "E" to 100%).
5. Green light indicates that the charging is
complete.
6. Unplug charger from battery charger
receptacle.
7