Lamborghini Caloreclima 55 PM/M-E Manuel D'installation Et D'entretien page 73

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

CALIBRATION AND SETTING UP
Legend
1 Ratio V
2 Ratio N
3 PL Air pressure check point
4 PBr Gas pressure check point
5 PF Combustion chamber pressure check point
Ensure that there are no leaks from the gas ramp.
-
start the burner at the maximum flow-rate;
-
to insert a gauge for the measure of the pressure of the gas to the head of the burner;
-
measure the CO
2
-
check the counter to see whether the flow-rate is as required: to adjust the quality of gas act on the air gate
servo control with small movements of the red cam until you obtain the desired flow-rate;
-
once you have obtained the desired flow-rate repeat the combustion test and, if necessary fine-tune the
GAS-AIR ratio V by acting on screw 1;
-
bring the burner to the 1
combustion by acting on N via screw 2.
-
re-check combustion at maximum flow-rate and various intermediate flow-rates as the burner is designed
for continuous modulation.
5
in the fumes, adjusting the GAS-AIR ratio V via screw 1;
st
stage position or minimum flow-rate (by adjusting the orange cam) and check
1
2
3
4
73

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

70 pm/m-e90 pm/m-e140 pm/m-e210 pm/m-e

Table des Matières