Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

Installation Instructions
Built-In Dishwasher
If you have questions, call 800.GE.CARES (800.432.2737) or visit our Website at: GEAppliances.com.
In Canada, please call 800.561.3344 or visit www.geappliances.ca
BEFORE YOU BEGIN
Read these instructions completely and carefully.
WARNING:
• Remove all power leading to the appliance from the circuit
breaker or fuse box before beginning installation. Failure
to do so can result in a risk of electrical shock.
persons, the installer must ensure that the dishwasher is
completely enclosed at the time of installation.
• The improper connection of the equipment grounding
conductor can result in a risk of electric shock. Check
are in doubt that the appliance is properly grounded. If
house wiring is not 2-wire with ground, a ground must be
provided by the installer. When house wiring is aluminum,
be sure to use UL Listed anti-oxidant compound and
aluminum-to-copper connectors.
persons, the installer should check to ensure that wires
are not pinched or damaged, the house wiring is attached
to the junction box bracket through a strain relief, and all
electrical connections made at the time of install (wire
nuts) are contained inside of the junction box cover.
ADVERTENCIA:
• Retire todos los conductores de corriente del
electrodoméstico de disyuntor o de la caja del fusible antes
de comenzar con la instalación. Si no cumple con esto, se
podrá producir el riesgo de descargas eléctricas.
• Para reducir el riesgo de descarga eléctrica, incendio o
lesiones a personas, el instalador debe asegurarse de que
el lavaplatos esté completamente cerrado en el momento
de la instalación.
• La conexión inadecuada del conductor de conexión a tierra
del equipamiento puede provocar un riesgo de descarga
de servicio técnico si tiene dudas sobre la correcta conexión
a tierra del aparato. Si el cableado doméstico no cuenta con
un cable de 2 hilos con conexión a tierra, un instalador debe
realizar una conexión a tierra. Cuando el cableado doméstico
es de aluminio, asegúrese de usar un compuesto antioxidante
y conectores de aluminio a cobre aprobados por UL.
• Para reducir el riesgo de descarga eléctrica, incendio o
lesiones a personas, el instalador deberá realizar un control
para asegurar que los cables no estén pellizcados ni dañados,
de empalmes a través de un amortiguador de refuerzo, y que
todas las conexiones eléctricas realizadas en el momento de
la instalación (tuercas para cables) estén dentro de la tapa de
la caja de empalmes.
FOR YOUR SAFETY
Read and observe all WARNINGS and CAUTIONS shown
throughout these instructions. While performing installations
described in this booklet, gloves, safety glasses or goggles
should be worn.
IMPORTANT –
ordinances.
• Note to Installer – Be sure to leave these instructions for the
consumer's and local inspector's use.
• Note to Consumer – Keep these instructions with your
Owner's Manual for future reference.
• Skill Level – Installation of this dishwasher requires
basic mechanical, electrical and plumbing skills. Proper
installation is the responsibility of the installer. Product
failure due to improper installation is not covered under
the GE Appliance Warranty. See warranty information.
• Completion Time – 1 to 3 Hours. New installations require
more time than replacement installations.
IMPORTANT –
allow for future removal from the enclosure if service is required.
Care should be exercised when the appliance is installed or removed,
to reduce the likelihood of damage to the power supply cord.
If you received a damaged dishwasher, you should immediately
contact your dealer or builder.
Optional Accessories – See the Owner's Manual for available
custom panel kits.
READ CAREFULLY.
KEEP THESE INSTRUCTIONS.
Printed in China
Observe all governing codes and
The dishwasher MUST be installed to
31-31558
09-15 GE

Publicité

Table des Matières
loading

Sommaire des Matières pour GE GLDT690JWW

  • Page 1 Installation Instructions Built-In Dishwasher If you have questions, call 800.GE.CARES (800.432.2737) or visit our Website at: GEAppliances.com. In Canada, please call 800.561.3344 or visit www.geappliances.ca FOR YOUR SAFETY BEFORE YOU BEGIN Read these instructions completely and carefully. Read and observe all WARNINGS and CAUTIONS shown throughout these instructions.
  • Page 2: Installation Preparation

    Installation Preparation PARTS SUPPLIED: Two #8 Phillips flat head wood screws, 5/8” long to secure dishwasher to underside of countertop (in literature package). 2 Wood Screws MATERIALS YOU WILL NEED: Ferrule, compression nut and 90° Elbow (3/8” NPT external thread on one end, opposite end sized to fit water supply) Wire Nuts (3) Thread...
  • Page 3: Drain Requirements

    Installation Preparation PREPARE DISHWASHER ENCLOSURE WARNING: the installer must ensure that the dishwasher is completely enclosed at the time of installation. ADVERTENCIA: This Wall Area must be Free Para reducir el riesgo de descarga eléctrica, incendio o lesiones of Pipes or 32-1/2”...
  • Page 4: Prepare Electrical Wiring

    Installation Preparation PREPARE ELECTRICAL WIRING WARNING: Alternate Receptacle • Remove all power leading to the appliance from the Location in Adjacent circuit breaker or fuse box before beginning installation. Cabinet Failure to do so can result in a risk of electrical shock. 18"...
  • Page 5: Installation Instructions

    Installation Instructions PREPARE HOT WATER LINE CAUTION: NOTE: GE recommends copper tubing for the water line, Opening the door will cause the WX28X326, dishwasher to tip forward. Do not open the door until you are ready to install the dishwasher. If it is necessary •...
  • Page 6: Installation Instruction

    Installation Instruction STEP 2 – ADJUST LEVELING LEGS STEP 4 – INSTALL POWER CORD • Move the dishwasher close to the installation location Skip this step if dishwasher will be direct wired. and lay it on its back. The power cord and connections must comply with the National Electrical Code, Section 422 and/or local codes and ordinances.
  • Page 7 Installation Instructions STEP 8 – SLIDE DISHWASHER PARTIALLY STEP 6 – POSITION WATER LINE AND INTO CABINET HOUSE WIRING IMPORTANT – • Position water supply line and house wiring on the floor of Do not push against front panel the opening to avoid interference with base of dishwasher with knees.
  • Page 8 Installation Instructions STEP 9 – POSITION DISHWASHER UNDER COUNTERTOP • Check to be sure that wires are secure under the dishwasher Reposition dishwasher and not pinched or in contact with door springs or other by grasping both dishwasher components. sides with hands TIP: Check tub insulation blanket.
  • Page 9 Installation Instructions STEP 11 – SECURE DISHWASHER TO STEP 12 – CONNECT WATER SUPPLY CABINET Connect water supply line to 90° elbow. The dishwasher must be secured to the countertop. • Slide compression nut, then ferrule over end of water line. •...
  • Page 10 Installation Instructions DRAIN LINE INSTALLATION STEP 13 – CONNECT DRAIN LINE • Connect drain line to air gap, waste tee or disposer using FOLLOW ALL LOCAL CODES AND ORDINANCES. either previously determined method. The drain hose molded end will fit 5/8”, 3/4” or 1” Method 1 - Air gap with waste tee or disposer diameter connections on the air gap, waste tee or disposer.
  • Page 11 Installation Instructions STEP 14 – CONNECT POWER SUPPLY STEP 15 – PRE-TEST CHECKLIST Skip this step if equipped with power cord. Review this list after installing your dishwasher to avoid charges for a service call that is not covered A. Remove junction box cover “A”. by your Warranty.
  • Page 12 Installation Instructions STEP 16 – DISHWASHER WET TEST Turn on power supply or plug power cord into outlet. Turn on dishwasher by pressing any button with the door open. Select Normal cycle. Press Start/Reset and close the door within 4 seconds. There will be a 5 second pause, followed by a 60 second pump- out.
  • Page 13: Lave-Vaisselle Encastré

    à une installation inadéquate n’est pas couverte par la mis à la terre, consultez un réparateur ou un électricien Garantie de GE. Reportez-vous à la Garantie du produit. • Durée de l’installation – Entre 1 et 3 heures. L’installation d’un nouveau lave-vaisselle exige plus de temps que le remplacement d’un ancien modèle.
  • Page 14: Préparation Pour L'installation

    Préparation pour l’installation PIÈCES FOURNIES : Deux vis à bois à tête plate cruciforme numéro 8, Vis spéciales à tête cruciforme de 1,6 cm de long pour bloquer le lave-vaisselle sur le dessous du comptoir (dans la documentation). MATÉRIAUX NÉCESSAIRES : Bague, écrou de compression et coude à...
  • Page 15 Préparation pour l’installation PRÉPARATION DE L’OUVERTURE DANS AVERTISSEMENT: LES ARMOIRES Pour réduire les risques de choc électrique, d’incendie ou de blessures, l’installateur doit s’assurer que le lave-vaisselle est complètement encastré au moment de l’installation. • Le lave-vaisselle doit être installé de façon à ce que le boyau de vidange mesure au maximum 3,05 mètres (10 pieds) pour Le mur du fond assurer une vidange adéquate.
  • Page 16: Préparation Pour L'installation - Alimentation Électrique

    Préparation pour l’installation - Alimentation électrique PRÉPARATION DU CÂBLAGE ÉLECTRIQUE AVERTISSEMENT: Autre emplacement possible pour la prise • Avant de commencer l'installation, coupez toute de courant dans une alimentation menant de l'appareil au disjoncteur ou au armoire adjacente fusible. Dans le cas contraire, vous pourriez être victime 46 cm (18 po) d'une décharge électrique.
  • Page 17: Préparation Pour L'installation - Alimentation D'eau Chaude

    ATTENTION: EAU CHAUDE Ouvrir la porte fait basculer le lave- REMARQUE: GE recommande l’utilisation d’un tuyau en vaisselle vers l’avant. Ne pas ouvrir pas cuivre pour la conduite d’alimentation en eau, mais vous la porte avant d’être prêt à installer WX28X326 de GE.
  • Page 18: Installation Du Lave-Vaisselle

    Installation du lave-vaisselle ÉTAPE 2 – RÉGLAGE DES PIEDS DE MISE À ÉTAPE 4 – INSTALLATION DU CORDON D’ALIMENTATION NIVEAU Sauter cette étape si le lave-vaisselle doit être câblé • Rapprocher le lave-vaisselle de l’emplacement directement. d’installation et le poser sur son dos. Le cordon d’alimentation et les connexions doivent être conformes au code électrique national, section 422 et(ou) aux réglementations et ordonnances en vigueur.
  • Page 19: Étape 6 : Mise En Place Du Tuyau D'eau Et Des Fils De La Maison

    Installation du lave-vaisselle ÉTAPE 8 : GLISSER LE LAVE-VAISSELLE À ÉTAPE 6 : MISE EN PLACE DU TUYAU TROIS QUARTS DANS L’OUVERTURE DE D’EAU ET DES FILS DE LA MAISON L’ARMOIRE IMPORTANT – Ne pas pousser contre le panneau la base du lave-vaisselle et des divers éléments sous avant avec le genou.
  • Page 20: Étape 9 - Positionnement Du Lave-Vaisselle Sous Le Comptoir

    Installation du lave-vaisselle ÉTAPE 9 – POSITIONNEMENT DU LAVE-VAISSELLE SOUS LE COMPTOIR • Vérifier que les fils sont bloqués sous le lave-vaisselle et qu’ils Replacer le ne sont pas pincés ni en contact avec les ressorts de la porte ou lave-vaisselle avec d’autres pièces du lave-vaisselle.
  • Page 21 Installation du lave-vaisselle ÉTAPE 11 – FIXATION DU LAVE-VAISSELLE ÉTAPE 12 : BRANCHEMENT DE AU PLACARD L’ALIMENTATION D’EAU Le lave-vaisselle doit être bloqué sur le comptoir. Brancher le tuyau d’alimentation d’eau au coude à angle droit. • Positionner le lave-vaisselle de manière à ce que la bride •...
  • Page 22: Étape 13 - Raccordement Du Conduit De Vidange

    Installation du lave-vaisselle ÉTAPE 13 – RACCORDEMENT DU CONDUIT INSTALLATION DU TUYAU DE VIDANGE DE VIDANGE • Brancher le tuyau de vidange sur le dispositif anti-siphon, OBSERVER TOUTES LES RÉGLEMENTATIONS ET le raccord en té d’égout ou le broyeur à déchets, en ORDONNANCES EN VIGUEUR.
  • Page 23: Étape 14: Branchement De L'alimentation Électrique

    Installation du lave-vaisselle ÉTAPE 14: BRANCHEMENT DE ÉTAPE 15 : LISTE DE VÉRIFICATION AVANT L’ALIMENTATION ÉLECTRIQUE DE FAIRE LES ESSAIS Sauter cette étape si le lave-vaisselle est équipé d’un Examiner cette liste après l’installation du lave-vaisselle cordon d’alimentation. Vérifier que le circuit est hors pour éviter les frais d’intervention qui ne sont pas tension.
  • Page 24: Étape 16: Essai Du Lave-Vaisselle Avec De L'eau

    Installation du lave-vaisselle ÉTAPE 16: ESSAI DU LAVE-VAISSELLE AVEC DE L’EAU Mettre le circuit sous tension ou brancher le cordon d’alimentation dans la prise de courant. Mettre le lave-vaisselle sous tension en pressant n’importe quel bouton, porte ouverte. Sélectionner le cycle Normal. Presser Start/Reset (Démarrer/Redémarrer) et fermer la porte dans un délai de 4 secondes.

Ce manuel est également adapté pour:

Gldt696jssGldt690jbb

Table des Matières