Goobay 51896 BeamerFlex Mode D'emploi page 24

Masquer les pouces Voir aussi pour 51896 BeamerFlex:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

User's Manual
1. B efore drilling, attend to live cables or other lines lying behind plaster, and
do not damage them.
2. Check the strength and stability of the ceiling before installation.
3. Select a suitable mounting location.
Fig. 17:
Ceiling mount 1
Fig. 18:
Ceiling mount 2
Fig. 19:
Ceiling mount 3
24
Allen wrench
4mm
Second person
4.
Mark the drill holes 1 to 3 with a
pencil.
Use the ceiling plate (A) as template.
5.
Drill the drill holes with a 10mm
concrete drill 60mm deep.
6.
Plug a concrete anchor (W-B) in each
drilling hole.
7.
Attach the ceiling plate (A) with the
ceiling screws (W-A) and washers D6
(W-C).
8.
Put the cover (B) onto the ceiling
plate (A).
M-D

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

51905 beamerflex

Table des Matières