Switch off the power supply, then prepare the 220V ~ single phase power cord without plug, make
sure the length no less than 300mm.
1. Mount the bracket on the wall and fix use two screws.
2. Disassemble the cover for the internal power cord connection.
3. For the oversink installation, the two outlets are lower direction, the left outlet is the water out-
let (hot / red), right outlet is the water inlet (cold / blue). Cross the power cord through the hole
on the backboard, then push the water heater toward the bracket until listening "Click".
4. Connect the power cable to the internal terminal block, for the under-sink installation, terminal
is GND-N-L respectively from left to right, for the undersink installation, connector is L-N-GND
respectively from left to right, then fix the power cable.
Prepare water connections, assemble the cover, then switch on the power supply.
Installation as oversink cable model
5