Thermador An American Icon VTN600 Mode D'emploi page 13

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 7: Mount Integral Blower or
Outlet Duct Transition for Re-
mote Blower
Integral Blower VTN600
10 and 12 for further detail)
A. Attach blower in front of round exhaust
outlet with 4-6 (depending on configura-
tion) #8 sheetmetal screws
B. Feed cord from blower through strain
relief.
C. Secure strain relief with screws.
D. Attach strain relief to downdraft near
junction box.
E. Connect cord to downdraft at 6 pin con-
nector
F. Connect blower to ductwork.
Remote Blower VTR600R or VTR1000Q
(See Figures 11 and 12 for further detail)
A. Remove junction box cover and connect
conduit with 5 wires from remote blower.
Hook up wires per Wiring Diagram,
Fig. 10. Replace junction box cover.
B. Attach duct transition at mounting holes
with sheetmetal screws.
C. Feed remote blower pigtail through strain
relief.
D. Attach strain relief to downdraft near
junction box.
E. Connect pigtail to downdraft at 6 pin
connector.
F. Run pigtail wires to junction box.
G. Inside junction box, connect conduit with
five wires from remote blower. Use a
conduit connector to secure.
Note: Blower and duct transition box may be
installed with duct outlet left, down or
right. Install blower or duct transition in
such a way that access panels can be
removed for service.
Figure 10 - Internal Blower
(See Figures
:
:
Figure 11 - Remote Blower
Internal Blower
Transition
Strain Relief
CV2T6
Remote Blower
Page 11
Strain Relief
Conduit To
Remote Blower
Pigtail
6 Pin
Connector
6 Pin Connector
Junction Box

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

An american icon vtr600rAn american icon vtr1000q

Table des Matières