Activate commissioning mode
To activate the charging station commissioning mode, proceed as follows:
1) Set DIP switch DSW2.8 to ON (see
2) Restart the charging station by pressing the "Service button" until the
Commissioning mode is activated as soon as the LED bar lights up orange.
You now have approx. 10 minutes to perform the required inspections and
acceptance tests. The contactor is then deactivated and the charging station
goes into an error state. This is indicated by the LED bar (white/red/red/red).
By restarting via the "Service button", the commissioning mode can be reac-
tivated.
Information
The energy in commissioning mode is taken into account when displaying
the total energy. During the commissioning mode, the display is displayed
in "watt-hours" (Wh).
Deactivate commissioning mode
In order to be able to operate the charging station properly, the commission-
ing mode must be deactivated again. To do this, proceed as follows:
1) Set DIP switch DSW2.8 to OFF (see
2) Restart the charging station by pressing the "Service button" until the
The charging station starts up again in normal mode and is ready for opera-
tion.
Installation manual V1.01
© EATON
first beep (approx. 1 second).
first beep (approx. 1 second).
Commissioning
8.1 DIP switch
settings).
8.1 DIP switch
settings).
45

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Xchargein x serieXchargein s serieXchargein m serie

Table des Matières