Télécharger Imprimer la page

Fontanot GENIUS 010 Q Instructions De Montage page 7

Masquer les pouces Voir aussi pour GENIUS 010 Q:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
English
WARNING: Carry out the installation in a "workmanlike" manner, strictly following the installation instructions and using
suitable tools. Always consult your local building department for code requirements that must be respected depending on
its destination of use (private, secondary, public...).
Before starting assembly, unpack all stair components. Place them on a large enough surface and check the number of
components, using the attached packing list.
Preliminary assembly
1. Assemble the parts 001010 for version 010 or the parts 001013 for version 020 on the treads 103009, 103010
and 103011 (Fig. 1) (Fig. 2).
2. Carefully measure the height from floor to floor to determine the number of plastic spacers 131030 or 131031. To
determine the number of plastic spacers 131030 or 131031 required, use TAB. 2 for staircases with spacers D78
(metal) or TAB. 3 for staircases with spacers D79 (wood) (H = height, A = rises). Example: for a measured height of
298 cm from floor to floor and a staircase with 13 treads and spacers D78, the following is required: see TAB. 2:
a) Read the number of plastic spacers required in column H in correspondence to the height of 298 cm, i.e. 40 in
column A/13.
b) One at a time distribute the plastic spacers in sequence above and below all the spacers D78 until they have
all been used up (keep the alignment with the injection point on the visible edge to improve aesthetics). Up to a
maximum of 3 plastic spacers can be fitted on the 1st spacer D78. Up to a maximum of 5 plastic spacers can be
fitted on the remaining spacers D78.
The final result is 3 plastic spacers on the 1st spacer D78 (2 above and 1 below), 4 plastic spacers on the 2nd
spacer D78 (2 above and 2 below), 3 plastic spacers on the eleven remaining spacers (2 above and 1 below).
3. Assemble the parts 033190, 001028, 001027, 011072, 033078 to the balusters 127010 from the side with the
3.5mm Ø hole positioned 10.5 cm away from the end. Assemble the cable conduit parts 034041 on the balusters
127010 with the parts 002050 (Fig. 1) (for railing 010).
4. Assemble the parts 033147 to the baluster 127002 using the parts 011064 and 005036 (Fig. 2) (for railing 020).
Cutting top landing
5. To define and trace the cutting lines for top landings:
1) carefully measure hole in ceiling.
2) calculate centre of hole in ceiling.
3) trace cutting lines using a tread to give the right direction, and a piece of the cardboard of the packing to obtain
the squareness of sides on the lower part (underside) of the landing, at a distance from the centre equivalent to half
the hole measured earlier (Fig. 4).
6. Cut the landing with an electric jigsaw, taking great care to avoid damaging the paintwork finish; use sandpaper to
remove any roughness on edges and protect with the supplied wood paint.
Assembly
7. Determine the position of the post on the floor, according to the dimensions of the landing cut earlier, and lay the
base 023012 (Fig. 3).
8. Drill holes with a 14 mm bit and fix the base 023012+012009+022001 to floor with components 008001 (Fig. 1) (Fig. 2).
9. Screw tube 042013 onto base 023012+012009+022001(Fig. 1) (Fig. 2) (Fig. 3).
10. Fit base cover 132017 or 132018 onto tube 042013 (Fig. 6).
11. Insert in the following order: the D78 or D79 spacers, the 131030 or 131031 spacing discs, the first tread (with the
wooden staves parallel to the specified ascending side (Fig. 5/A), the D78 or D79 spacer, the 131030 or 131031
spacing discs and once again the tread (with the wooden staves parallel to the specified ascending side), and so
on. Place the treads in the position given by the configuration (Fig. 6).
12. When the top of the tube 042013 is reached, screw on component 022003, screw on next tube 042013 and
continue with assembly of staircase (Fig. 1) (Fig. 7).
13. Once the end of 042013 tube is reached, screw the 022001 component to the 046036 component keeping the
threaded hole upwards (screw on the 046036 element, keeping in mind that it must be at the same height as the
landing). Continue to insert the treads using the compensation component 023001 in the D78 or D79 spacer and
the 131030 or 131031 spacing discs (Fig. 7).
14. Cut the 023001 component at about 3 mm from the fixed rabbet of the shortest part, inserting it into the D78 or
D79 spacer, and insert in order the D78 or D79 spacer and the 088002 landing. Align the landing with the small
hole (which allows the passage of the baluster) on the leading side of the treads (Fig. 5)
15. Insert the 023035 or 023037, 022065, 009010 components and tighten component 005008 sufficiently,
remembering that the treads must still be free to rotate (Fig. 1) (Fig. 2).
7 - Genius 010 - 020 Q

Publicité

loading

Ce manuel est également adapté pour:

Genius 020 q