Creating Vacuum In Channeled Bags Outside The Vacuum Chamber - Orved Evox 25 Mode D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

OPERATION
7.4.4 CREATING VACUUM IN CHANNELED BAGS OUTSIDE THE VACUUM CHAMBER
1) Plug into a suitable electrical socket.
2) In case of first use, run the vacuum sensor calibration as described
at § 6.1.
3) Put the accessory on the chamber frame in frontal centre position.
4) Place the channelled bag outside the machine, paying attention
to put the bag open side at least 2 cm over the sealing bar.
1
5) Press PUMP key, then START to start the
vacuum cycle.
6) Close the lid exerting a slight pressure on the
front.
7) Once the required vacuum level (detecta-
ble through the vacuum gauge) has been
reached press SEAL key. Verify the sealing
quality and the lack of air bubbles inside the
bag.
After the cycle ending an acoustic signal advice
that the machine is ready for a new vacuum
cycle.
30
Rev. 02 - 05/2016 - Cod. 1500015 - Instruction manual for vacuum chamber packaging machines EVOX 25 / EVOX 25 H
2
2
cm
3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Evox 25 h

Table des Matières