Installation; Mounting Height & Clearance - Zephyr Roma Groove ZRG-E30AS Guide D'utilisation, D'entretien Et D'installation

Masquer les pouces Voir aussi pour Roma Groove ZRG-E30AS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

D
n .
m i
E
n .
m i
x . F
m a
Standard
Hood Heights
Duct Cover
minimum ducted (A)
27"
minimum recirculating (B)
32"
maximum (C)
50"
Ceiling Heights
minimum ducted (D)
87" (7' 3")
minimum recirculating (E)
92" (7' 8")
maximum (F)
120" (10')
DUCTING
A minimum of 6" round duct must be used to
maintain maximum air flow efficiency.
Always use rigid type metal ducts only. Flexible
ducts could restrict air flow by up to 50%.
Use calculation worksheet to compute total duct
work (Page 6).
ALWAYS, when possible, reduce the number of
transitions and turns. If a long duct run is required,
increase duct size from 6" to 7".
If turns or transitions are required: Install as far
away from duct opening and as far apart between
the two transitions as possible.
Minimum mount height between range top to hood
bottom should be no less than 24".
A
n .
m i
B
n .
Maximum mount height should be no higher than
m i
x . C
34".
m a
It is important to install the hood at the proper
mounting height. Hoods mounted too low could
result in heat damage and fire hazard; while hoods
i n .
a x .
mounted too high will be hard to reach and will
" m
2 4
" m
loose performance and efficiency.
3 4
If available, also refer to range manufacturer's
height clearance requirements and recommended
hood mounting height above range. Always check
your local codes for any differences.
Duct cover extension kit available for ceiling
"
3 6
heights up to 12 feet. Turn to page 21 for part
number and ordering information.
DAMAGE-SHIPMENT / INSTALLATION:
• Please fully inspect unit for damage before

installation.

Extension
• If the unit is damaged in shipment, return the
Duct
Cover
unit to the store in which it was bought for
42"
repair or replacement.
47"
• If the unit is damaged by the customer, repair
80"
or replacement is the responsibility of the
customer.
102" (8' 6")
• If the unit is dmaged by the installer (if other
107" (8' 11")
than the customer), repair of replacement must
150" (12' 6")
be made by arrangement between customer
and installer.
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Roma groove zrg-m90as

Table des Matières