Broan Elite E60000 Serie Instructions page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8. HORIZONTAL DISCHARGE INSTALLATION (
All internal blower hoods are factory shipped with the blowers mounted for a vertical discharge configuration. For a horizontal
discharge configuration, disassemble the blower(s) from the inner top of the hood and mount it (them) to the inner back panel
of the hood. The procedure below applies for one or two blowers.
Using a 5/16" socket, remove all
blower mounting screws from the
inner top of the hood. Keep the
screws for further use.
Slide the blower to disengage its flange from the
retaining bracket.
Rotate the blower and engage its
flange in the back wall retaining
bracket.
Using a 5/16" socket and the
screws previously removed, secure
the blower to the hood.
L
S
M
EFT
IDE
OUNTING
S
L
CREW
OCATION
HD0269
HD0270
R
IGHT
M
OUNTING
L
OCATION
HD0288
- 9 -
INTERNAL BLOWER(S) HOOD ONLY)
R
M
OUNTING
HD0282
S
IDE
S
CREW
HD0289
S
IGHT
IDE
S
CREW
L
OCATION
L
S
M
EFT
IDE
OUNTING
S
L
CREW
OCATION

Publicité

Table des Matières
loading

Table des Matières