Zephyr SienaZSI-E30AS-ES Guide D'utilisation, D'entretien Et D'installation page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

!
CAUTION: At least two installers are
required due to the weight and size of the
hood.
1. Measure from range top to hood bottom and mark line A.
(26" minimum from range top).
2. Plum and mark center line.
3. Mark mounting height line B. (1-5/16" from line A)
4. Mark mounting height line C. (13-1/8" from line A)
5. Mark mounting spread from C/L on line B 12-3/4"
6. Mark mounting spread from C/L on line C 9-7/16"
7. Fasten (2) M4 x 1-1/2" screws into studs on line C. Do not
fasten screws all the way. Note: wood blocking may need
to be added behind the drywall if no studs are present.
Wall anchors may also be used but check local codes
for compliance. Failure to use suitable wall anchors
and screws to hold the weight of the hood could result
in personal injury or damage to cooking surface or
counter.
8. Install 8" round duct collar with backdraft damper to top of
body of hood by (4) M4x8 flat screws.
9. Hang hood onto screws and hand tighten. (FIG. A #1) Use
(2) M4 x 1-1/2" screws to further secure the hood to the wall
from inside the hood on line B.
10. Center and attach duct cover bracket to wall below ceiling
or soffit using (2) M4 x 1-1/2" screws.
11. Position electrical outlet within the space covered by the
telescopic duct covers and where it will not interfere with
the round duct. (FIG. B)
12. *Install duct work and duct tape.
13. Power up hood and check for leaks around duct tape.
14. Place telescopic duct covers onto hood and extend inner
(top) duct cover upwards and secure to duct cover bracket
using (2) M4x8 screws.
The ducting from this fan to the outside of the building has
a strong effect on the air flow, noise and energy use of the
fan. Use the shortest, straightest duct routing possible for
best performance, and avoid installing the fan with smaller
ducts than recommended. Insulation around the ducts can
reduce energy loss and inhibit mold growth. Fans installed
with existing ducts may not achieve their rated air flow.
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
C/L
9-7/16"
C
12-3/4"
B
A
C/L
H O O D
C E N T E
R L IN E
FIG. B
9
Duct Cover
Bracket
13-1/8"
26" min
C
B
FIG. A
4 ¼ "
M A X .
2 4 "
M A X .
1 2 "

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Siena zsi-e36as-es

Table des Matières