INSTALLATION STAGES:
Prior to installation, all the system components must be inspected to make sure they are free from defects and deformation.
Before starting the installation, identify the locations of the end and intermediate components, taking care to follow the spacings between them as
determined during the survey. Reminder: the minimum spacing is 5 metres and the maximum is 15 metres.
END ANCHORS
FA 60 201 00
The FA 60 201 00 end piece can be ground, wall or ceiling mounted.
It must always be positioned such that the lifeline is in line with the
two fixings.
F
F
It can be assembled:
On FA 60 211 30 and FA 60 211 50 posts using
M12 x 45 mm bolts (provided with the posts)
On FA 60 207 00 clamping plates or
FA 60 208 00 clamped fixings using M12 x 45 mm bolts (provided
with the fixing plates)
42