Assembling Stacked Ovens - ITW Food Equipment Group HOBART VC4ED Manuel D'installation Et D'utilisation

Table des Matières

Publicité

ASSEMBLING STACKED OVENS

Unpack the ovens and the stack kit . Position the oven to be used as the bottom oven on its left
side for access to the oven bottom, taking care not to scratch or damage it.
Attach the four leg
assemblies with the 24 bolts and lockwashers (six per leg).
Place the lower oven (with legs
) on the floor and remove two
/
" (11 mm) diameter
7
16
knockouts on each side of the top
.
Install two locating studs to the bottom of the top oven per stacking kit instructions.
Move the oven with legs
to the installed position. Place the upper oven on top of the lower
oven using the locating studs.
Remove the optional rear panel, if provided, from the TOP oven.
Install
the Stacking Flue (Fig. 3) with the four screws provided. Replace the top oven rear panel, if
provided.
STACKING FLUE
– 6 –

Publicité

Table des Matières
loading

Table des Matières