Required Tools; Installation Steps - Sortimo TopSystem 1000005390 Notice De Montage

Kit de montage sur une barre latérale pour déflecteur
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 10

Required tools

• Torque wrench 1-25 Nm,
• Hexagon tool head SW 10,
• Tool head Torx 30,
• Folding rule,
• Stable ladder,
• Carpet knife.
Required installation materials
1)
• 1x required for installation.
a
b
• 1x required for installation.
c
• 2x required for installation.
d
• 2x required for installation.
e
• 2x required for installation.
f
• 4x required for installation.
1) The installation materials are shown on
page 18.

Installation steps

Step 1: Preparing for installation
▶ Select the required installation position.
▶ Remove dirt and grease from the
installation surfaces.
Step 2: Fix the retainers in place
▶ Fix retainer a to the spoiler (See figure A,
page 18).
▶ Fix retainer b to the spoiler (See figure B,
page 19).
▶ Tighten screws f with 7-8 Nm.
Step 3: Fix the product in place
▶ Position the spoiler at the required position
between the side rails of the Sortimo
TopSystem.
▶ Fix the spoiler in place at both sides (See
figure C, page 19)
▶ Tighten the nuts e with 14-16 Nm.
© Sortimo International GmbH
MA 00049 | 2017-11-23
English
7

Publicité

Table des Matières
loading

Table des Matières