Hood Installation - NuTone NTM Serie Instructions D'installation

Masquer les pouces Voir aussi pour NTM Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

HOOD PREPARATION - HORIZONTAL DISCHARGE INSTALLATION
3
"
10"
1
X
DUCT INSTALLATION
4
3. If installed, remove and discard the large shutoff plate located on the BACK of the hood.
4. If installed, remove and discard the small shutoff plate located INSIDE the back of the
hood. Keep the screws for further use. DO NOT RENMOVE THE GASKET!
5. Using 10 screws previously removed in point 4, install the adapter on the gasket, in the
inside back of the hood.
6. Install the damper in the adapter, as shown beside.

HOOD INSTALLATION

1. Insert the power cable in the hood and tighten the wire clamp to secure the cable.
2. Align hood's keyhole mouting slots over the four (4) partially installed screws.
3. Making sure the duct positions over the hood's duct adapter, push the hood against the rear wall. Secure hood by tightening screws.
HO0049
HO0048
HJ0005
HJ0002
-5-
(CONT'D)

Publicité

Table des Matières
loading

Table des Matières