HOOD PREPARATION - VERTICAL DISCHARGE INSTALLATION
6"
ROUND DUCT INSTALLATION
4. Mount the 6" round adapter on the top of the hood, using 10 screws (included).
3
1
⁄
"
10"
X
DUCT INSTALLATION
4
4. Mount the 3
1
⁄
" x 10" adapter on the top of the hood, using 10 screws (included).
4
HOOD PREPARATION - HORIZONTAL DISCHARGE INSTALLATION
3
1
⁄
"
10"
X
DUCT INSTALLATION
4
1. Install the rubber gasket (included) on the top of the hood, as shown beside.
2. Mount the shutoff plate on the top of the hood, using 10 screws (included).
(CONT'D)
-4-
HJ0001
HJ0003
HO0050
HO0051