6" ROUND
ELBOW
10. Measure and install 6" round steel ductwork to roof cap or
o
wall cap and 90
elbow over duct collar on hood. Use duct
tape to make all joints secure and air tight.
11. Plug hood power cord into the outlet.
LOWER FLUE MOUNTING BRACKET
LOWER
FLUE
12. Remove the upper flue from inside the lower flue. Install the
lower flue bracket to the lower flue using (2) flue bracket
screws (#8 x 3/8"). Ensure that the bracket is positioned
inside of the lower flue flanges - with the slots on top.
Carefully replace the upper flue inside the lower flue. Remove
protective plastic film covering the lower flue only.
13. Carefully place both flues into the recessed area of hood top.
UPPER FLUE MOUNTING BRACKET
UPPER
FLUE
HO0104
14. Slide the upper flue upward until it is aligned with its upper
flue mounting bracket. The bracket should be inside the flue.
Secure the upper flue to the upper flue mounting bracket
using (2) #8 x 3/8" mounting screws.
15. Remove protective plastic film covering the upper flue and
the hood.
16. Mount the glass plate on the top of hood base with (4) flat
head screws (M4 x 30mm) and (4) decorative washers. Screw
from top of hood base. Do not overtighten these screws.
17. Install (2) type B10, 120V, 40W max. candelabra incandescent
bulbs (included).
18. Reinstall grease filter by aligning rear filter tab with slot in the
hood, pull down the metal latch tab, push filter into position
and release. Make sure filter is securely engaged after
installation.
NS54000 SERIES
Page 6
FRONT VIEW