Parts List; Part Description - Pentair Myers MBSP-3 Manuel D'installation Et D'utilisation

Système de secours à batterie
Masquer les pouces Voir aussi pour Myers MBSP-3:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PARTS LIST

Key No.
* If pump fails, replace entire system.
** Sold separately.
NOTICE: All check valves must be installed as described in the installation instructions or the warranty is
void. This includes the check valve for the primary sump pump in a Common Discharge installation.
Optional Batterry Supplies Sold Separately
16
1
2
1-1/4 FNPT x 1-1/2 Slip Elbow
3
4
5
6
7
8
Gateway Kit (Gateway, Power Supply, 1m RJ45 Cable)

Part Description

AGM 40A-Hour
Second Battery Case & Cable
Part Description
DC Backup Pump
Float Switch
Charger/Controller
Battery Case Base
Battery Case Cover
AC Adaptor
Cable Ties - 11"
Part Number
BAT40
U117-1577
Part Number
PS17-2005*
U78-1012
PS17-2003
PS217-1522
PS17-2044
PS17-2045
PS17-2008
**
U117-1568
MY979 (06-08-20)

Publicité

Table des Matières
loading

Table des Matières