PARTS, TOOLS, MATERIALS
YOU WILL NEED THE FOLLOWING TOOLS AND MATERIALS FOR THE INSTALLATION:
Carton or other heavy material for covering the counter top.
Clear tape
(for taping the templates to the wall)
Saber saw (for cutting vent
holes for roof or wall venting)
Phillips screwdriver (for the screws)
Pencil
‹
If you have brick or masonry walls, you will need special hardware and tools.
¡ ¡
Flat blade screwdriver (for the toggle bolts)
Measuring tape (metal preferred)
Small side cutters or tin snips
‹
The ductwork you need for the installation is not included. All wall and roof caps must have a back-draft
¡ ¡
damper.
INSTALLATION
Keyhole saw (for the power cord hole)
3/8" and 3/4" wood drill bits
1/2" and 3/16"
drill bits
- 35 -
Stud finder or thin nail.
Electric drill
Plumb line
Duct Tape
Caulking gun