oventrop Regucor WHS Mode D'emploi page 28

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

– Realise piping of supply and return starting from
the heating circuit group (illustr. 11 point 1) or use
connection set item no. 138 35 80 and item no.
138 35 81 for an optional second heating circuit.
Please ensure correct connection of supply and
return.
– Push rear insulation shell of the fresh water station
(point 2) and of the solar group (point 3) onto the
bracket.
– Firmly screw ball valves for the connection of the
fresh water station to the storage cylinder (points
4).
Illustr. 11 Installation of thermal insulations
Connection set item no. 138 35 80 for the connection
of a heating circuit to the fresh water station.
Consisting of:
2x stainless steel pipe (L = 1260 mm)
2x stainless steel pipe (L = 500 mm)
4x ring gasket for G 1
3
4x ring gasket for G
4
Connection set item no. 138 35 81 for the connection
of the second heating circuit item no. 138 35 81.
Consisting of:
2x stainless steel pipe (L = 1260 mm)
4x ring gasket for G 1
28
– Suspend fresh water station into the bracket
(illustr.12 / 13)
– Secure against twisting with a safety screw and
washer.
Return
Supply
Illustr. 12 Installation of fresh water station
Illustr. 13 Installation of fresh water station

Publicité

Table des Matières
loading

Table des Matières