Daikin FXFQ07TVJU Manuel D'installation page 13

Masquer les pouces Voir aussi pour FXFQ07TVJU:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CAUTION
• Do not apply excessive force to the attached drain
hose (1) by bending or twisting it.
This could cause water leakage.
• In case of centralized drain piping, carry out piping work
according to the procedure shown in the fol lowing Fig. 18.
Centralized drain piping
Make a downward inclination of 1/100
or more to avoid stagnancy of air.
If water stagnates in the drain
piping, it may cause clogging of
drain piping.
Fig. 18
• Select a size for the centralized drain piping that meets
the capacity of indoor units to be con nected. Refer to
the technical document.
• When installing the new indoor unit, use the attached
new drain hose (1) and the metal clamp (2).
If an old drain hose or a metal clamp is used, it may
cause water leakage.
(2) After piping is finished, check if the drain flows
smoothly.
[When the electric wiring work is finished]
• Gradually pour 1/4 gal. (1 L) of water from the air outlet
on the left side of the drain socket into the drain pan
using caution to avoid splashing water on the electric
components such as the drain pump. Confirm drain-
age by operating the indoor unit under cooling mode
according to 9. FIELD SETTING AND TEST OPERA-
TION. (Refer to Fig. 19)
Drain piping
Plastic container for pouring water
(Tube length of 4 in. (100 mm) or
more is necessary.)
[Method of adding water]
Fig. 19
• After checking the drainage of water, refer to Fig. 20
and attach the sealing material (14) to perform the
thermal insulation of the drain socket.
3P161684-7N
English
Drain outlet for service
(with rubber plug)
Use it when draining water
in the drain pan
Fig. 20
[When the electric wiring work is not finished]
• The electric wiring works (including ground) must be
carried out by a qualified electrician.
• If a qualified person is not present, after the electric
wiring work is finished, check the drainage accord ing
to the method specified in [When the electric wiring
work is finished].
1. Open the control box lid and connect the single
phase 208 - 230 V power supply to the terminal (L
L
) on the terminal block (X2M).
2
Connect the ground wiring to the ground terminal.
(Refer to Fig. 21)
Terminal block (X2M)
Single phase
L
1
power supply
L
208/230 V
2
Ground wire
Ground terminal
Fig. 21
2. Make sure the control box lid is closed before turn-
ing on the power supply.
• Throughout the whole process, carry out the
work using caution with wiring around the control
box so that the connectors not come off.
3. Gradually pour 1/4 gal. (1 L) of water from the air
outlet on the left side of the drain socket into the
drain pan using caution to avoid splashing water on
the electric components such as the drain pump.
(Refer to Fig. 19)
Sealing material (14)
(accessory)
,
1
Control box lid
10

Publicité

Table des Matières
loading

Table des Matières