7. Attach dual blower PCB box to electronics
Follow Steps 1 through 4 on page 13, then continue PBD-1300A horiztantal ducting installation by following the
steps below.
ducting.
7. From inside hood body, position top cover plate
to top of hood body. From outisde hood body,
attach top cover plate to top of hood body using
8. Connect single and dual blower PCB blower
A
6. Position dual blower inside hood body. Attach by
wire extension cable to new blower and connect
both plugs from each blower to female plugs
behind switch panel.
13