Switch cabinet assembly
Requirements
-
The M8 jack rings are screwed into the cooling unit, see
-
The cooling unit is secured correctly with lashing straps.
Required tools and material
-
Lashing straps, loading crane, if applicable
Procedure
Raise the correctly secured cooling unit slowly and evenly; see figure
Assembly the cooling in a level position.
Position the cooling unit on the switch cabinet roof and align it with the cut-outs.
Ensure that the condensate drain (1) is positioned at the lowest point.
Install the condensate drain hose on a consistent decline and without kinks.
The condensate drain hose length must not exceed 3 m.
Check regularly during operation to ensure that the condensate water drains correctly.
Position the cooling unit precisely in the cut-out.
All six casement fasteners (2) on the inside of the switch cabinet; see the figure Cooling unit assembly - detail A.
Screw in all six casement fasteners (2) on the inside of the switch cabinet over the rail to mount the cooling unit;
see the figure Cooling unit assembly - detail B.
The cooling unit is attached to the switch cabinet and ready for electrical connection, see .
Operating Manual DTT 6301 Standard Controller (SC) 086100026 © Pfannenberg GmbH
2
1
3
A
Figure 19 – Cooling unit assembly with casement fasteners
2
B
Mounting M8
.
jack rings
and DTT cooling unit
assembly.
Page 21 / 42