Bradley SN2005/AST4 Manuel D'installation page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
1
Install and Anchor Unit
Rough-in of plumbing lines must be completed
before unit can be properly installed.
A
Remove Access panel and with
the help of another person, place
unit in position.
B
Ensure unit is level, shimming floor unit if
necessary. Using the base as a template,
mark the floor anchor locations.
2
Connect Water Supply to Valve Assembly
WARNING! Do not turn on water until
Step 3 is completed!
Connect stops to hot and cold water supply.
A
Connect one end of each supply hose to a
stop and the other end to the hot and cold
inlets of the Navigator
Bradley • 215-1066 Rev. H; ECN 12-00-004
Water Supply
Gang Valve
Assembly
TMV.
®
OPTIONAL TEMPERED LINE CONNECTION: Connect one
B
end of the supply hose to the stop and the other end to the
tempered line adapter in the gang valve assembly.
15" (381) Dia.
Install a minimum of four 3/8" bolts (supplied
C
by installer) around unit at the marked
locations (eight is recommended). Secure
unit to floor.
Red Tube
(to Aerator)
Green Tube
(to Aerator)
Black Tube
(to Aerator)
Yellow Tube
(to Aerator)
Clear Tube
(to Aerator)
Navigator
TMV
Cold Supply Inlet
Stop Valve
12/04/2012
SN2005/AST4, SN2005/AST4-F
Water Supply Gang
Valve Assembly
OPTIONAL
Tempered
Line Adapter
Assembly
(S39-804)
Braided
Hose
Hot Supply
Inlet
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sn2005/ast4-f

Table des Matières