Télécharger Imprimer la page

Miele PW 5064 Notice De Montage page 11

Publicité

Produktgruppe 511
11 von 36
Danger!
Risk of cutting and grazing of the arms and hands by the stopper bracket on the drain plate when carrying out this work.
Fasten the guide rails with the fitted drain plate to the connection box with washer and M5 nut (torque 3.8 Nm).
Secure the guide rails in the front of the plinth on the cover plate with 2 M5 cheese-head bolts, washers, and M5 nuts
(torque 3.8 Nm) in each case.
Fit the surface filter, Fig. 4, Pos. 4, in the drawer, Fig. 4, Pos. 5, and press it into its retainers.
Fit the drawer in the guide rails and push it in as far as the stopper bracket (pull-out stop). Then lift it slightly and push it in fully.
Fit the two 90° pipe bends together and lay them from the machine drain outlet to the connection box, Fig. 5.
Danger!
Risk of tipping and falling! It is absolutely essential to bolt the machine to the plinth, and to bolt the plinth to the floor! See the plinth fitting
instructions for UO 5005-08 or UG 5005-75 (supplied with the plinth).
Note
For details of the drain connection to the floor or wall, see the installation plan for PW 5064 EL MOPP.
Danger!
Risk of scalding due to drainage of hot suds.
Risk of chemical burns to the skin and eyes due to drainage of aggressive suds. The machine must only be operated with the drawer
fitted and fully closed. Only open the drawer after the programme has finished completely.
Danger!
Risk of injury due to falling drawer. The stop bracket prevents the drawer being fully pulled out after it has been moved approx. 100 mm.
The operator can override this stop by lifting the drawer slightly and pulling. The drawer can then be removed completely.
Note
When fitting the drawer, take care with the stop. The operator can override this stop by lifting the drawer slightly and pushing. The drawer
can then be pushed in completely.
Note
Check the surface filter after every wash cycle. If necessary clean the filter and then refit it in its retainers in the drawer.
Carry out appropriate safety checks.
Reconnect the machine to the electrical mains and, if applicable, to the gas mains.
Carry out a functional test either with a service programme or a wash programme. Carry out a check for leaks between the machine
drain exit and the drain connection in the floor or wall.
en
12.11.2010
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Umbau- und Montageanweisung
M.-Nr. 07312111

Publicité

loading

Ce manuel est également adapté pour:

Ffk500507312050