Putting Into Operation; Declaration Of Conformity; Type Approval; Hotline - Funkwerk MULTI MODE COMPENSER Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

UMTS/GSM-MMC

Putting into operation

With the ignition switched off, use a voltmeter at the connection point of the con-
nection cable and power supply cable to check whether the constant positive is
connected correctly (+12 V between red and brown).
Should the polarity be reversed, establish the correct pin assignment. The COM-
PENSER is protected against polarity reversal; the device will not be damaged.
Switch on the ignition and check at the connection point of the connection cable
and power supply cable whether the ignition lead is connected correctly (+12 V
between blue and brown).
Establish a mobile phone connection and test the connection to ensure it works
correctly.

Declaration of conformity

We, Funkwerk Dabendorf GmbH, declare with full responsibility that the product
UMTS/GSM - MULTI MODE COMPENSER meets the requirements of Directive
1999/5/EC of the Council of the European Union.

Type approval

Type approval in accordance with Directive 72/245/EWG, last amended by Direc-
tive 2006/28/EG, was granted at the Kraftfahrt-Bundesamt (Federal Motor
Transport Authority) under number

Hotline

In the case of questions, our hotline is available Monday - Thursday from 8:00 to
18:00 and Fridays from 08:00 to 16:30:
1. Check that you have correctly followed all the steps described in the
installation manual.
2. Have ready the names of the devices you are using (mobile, GSM-
modul etc.).
3. Try to describe the problem as accurately as possible.
You can reach the hotline as follows:
Telephone: +49 (0) 3377 / 316 233
+49 (0) 3377 / 316 234
Telefax:
+49 (0) 3377 / 316 244
e-mail:
service
fwd-online.de
@
Putting into operation GB
03 5240.
-21-

Publicité

Table des Matières
loading

Table des Matières