Sway Control Installation - Cequent Performance Products 49901 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SWAY CONTROL INSTALLATION

1. Refer to Figures 1 and 2
a. Connect trailer to tow vehicle. Position vehicle and trailer in a straight line on a level surface.
b. Mount sway control ball (1a) using nut (1b) and lock washer (1c) to hitch as shown in Figure 2 and torque to 100 lb.-ft. If necessary
notch and weld ball mounting bar (4) (sold separately) into position shown.
c. Measure and mark a point on the trailer tongue 24" from the center of the hitch ball as shown in Figure 2.
d. Align the center of the ball of the ball/plate assembly (3) with the mark on the trailer tongue and center punch four hole locations. Drill
four holes using an 11/32 (.343) drill bit for 1/8" (.125) or thicker trailer tongue material, or a 9/32" (.281) drill bit for thinner material.
e. Position the ball/plate assembly (3) over the drilled holes and drive four of the self tapping screws (2a) through the plate and into the
trailer tongue. Drill the two remaining holes and install the screws.
NOTE: For left hand installation, remove slide bar (6), and reinstall upside down.
2. HOOK-UP
a. Lubricate both balls with a small amount of grease, place socket of slide bar (6) over ball (1) and secure with gold clip (2b). Loosen
handle (5) until the slide bar can be moved. Extend sway control assembly and place socket over ball on trailer, secure with other gold
clip (2b).
b. Retighten handle until it stops.
c. On some installations, damage to the sway control may occur during extremely sharp turning maneuvers. This can be checked by slowly
backing vehicle into a jackknife position while someone is watching. Do not allow slide bar to contract completely (bottom out) or
bumper to contact sway control. If it looks as though contact will be made or the sway control will bottom out then the sway control
must be removed before backing trailer.
3. ADJUSTMENT
a. Trailer configurations and loading, road and weather conditions, towing speed, tire condition and pressure, and center of gravity of
trailer all affect towing. To get maximum benefits from the sway control assembly, a series of road tests should be taken with the
loaded trailer. On subsequent trips increase or decrease tension by turning the adjusting bolt (7) in 1/4 turn increments in the direction
shown on the label until the desired control is achieved. For large trailers, it may be necessary to install a second sway control unit.
b. After about 1000 miles of towing, remove the slide bar from the sway control and clean the friction surfaces with a wire brush. Repeat
this cleaning procedure about every 10,000 miles.
4. UNHOOKING
a. Release tension by turning on/off handle counterclockwise.
b. Remove both clips (2b), remove sway control.
©
2010 Cequent Performance Products
Printed in CHINA
Installation Instructions
Round Bar Weight Distribution With Sway Control
49901IN
GENERAL SWAY CONTROL MOUNTING DIMENSIONS
FIGURE 2.
Sheet 6 of 24
49901IN
Part Numbers:
49901
49902
49903
49904
03/21/13
Rev. C
Form: F205 Rev A 5-6-05

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

499024990349904

Table des Matières